MERCO is the biggest Bitumen cut-back manufacturing facility in the Kingdom of Bahrain

Bitumen 10/20

About Mouno

MERCO GROUP

Bitumen 10/20

MERCO PRODUCTS

Bitumen 60/70 Penetration

It is a kind of hard penetration grade bitumen which is provided during the process of oxidation of vacuum bottom the bitumen production that drives from distillation tower residue in vacuum oil refineries at bitumen production unit. Bitumen penetration grade 10/20 ensures long-term savings because it allows for a thinner pavement design, which uses up to 30% less asphalt than traditional designs while ensuring extended pavement life. Merco exporting bitumen 10/20 its penetration hard grade and softening between 10 to 20.

bitumen 10/20 is hard penetration grade bitumen using as paving grade bitumen suitable for road construction and repair also for the production of asphalt pavements with the below technical specification. This grade of bitumen is mainly used in the manufacture of hot mix asphalt for bases and wearing courses.

Penetration Grade Bitumen is a standard bitumen usually used as a Paving Grade Bitumen essential for road construction and for the production of asphalt pavements with superior properties, and it’s very important once it bounds the aggregates and creates a unique cohesion and stability to the bituminous mix.

 

Application of bitumen penetration grade 10/20

 

Bitumen 10/20 is suitable for road construction and repair for the asphalt pavements with superior properties. This type of bitumen used in the manufacture of hot mix asphalt for bases and wearing courses and the bitumen 10/20 is also for production of pavements.

 

Guaranty and safety of bitumen penetration 10/20

 
Merco bitumen guaranty the quality of bitumen penetration grade 10/20 with the arrangement of the international inspectors to check quality and quantity of the bitumen penetration grade 10/20 during the loading to the vessel and controlling the production by QC by batch test report before shipping. Merco Company guarantees the quality to meet with ASTM.

specification of bitumen penetration 10/20

 
Bitumen 10/20Test methodUnitSpecification
Specific gravity @ 25°cASTM D70Kg/cm31.01/1.06
Penetration @ 25°cASTM D5Mm/1010/20
Softening point °cASTM D36°C58/66
Ductility @25 °cASTM D113Cm100 min
Loss on heating(wt) %ASTM D6wt %0.2 max
Drop in penetration after heating %ASTM D5-D6%20 max
Flashpoint cASTM D92°C250 min
Solubility is CS2(wt) %ASTM D4wt %99.5 max
Spot testA.a.s.h.o.t102 Negative